Skip to content

Office cleaning

Construction Handover Cleaning for Developers

We calculate the price of cleaning a building before handover individually after visiting the site. We clean apartments and commercial units, entrances, stairwells, lift lobbies and windows after construction.

  • Price calculated individually after a site visit
  • Units, stairwells and lift lobbies
  • VAT invoices available

What's included

Tasks by area. Add any extra wishes to your request.

Units and premises

  • Construction dust from every surface
  • Traces of paint, glue, grout and foam
  • Fixtures, tiles, doors and windowsills
  • Floors in several rounds

Common areas

  • Entrances and staircases
  • Lift lobbies and lift cars
  • Handrails, mailboxes and doors
  • Entrance lobbies

Windows and shop fronts

  • Windows after construction: removing paint and film
  • Ground-floor shop windows of commercial units
  • Frames and windowsills

How much it costs

“From” prices come straight from our price list. The total depends on size and condition.

  • We calculate the price individually after inspecting the site.

Full price list

We calculate the price individually after inspecting the site.

Request a site assessment

Leave your details and the site address. We will arrange a visit and send a proposal with price and timing.

Required. For example, +374 XX XXX XXX

Add details (optional)

We are closed on Sundays

By clicking the button you agree to our privacy policy.

How ordering works

Four simple steps from quote to clean.

  1. 1

    Leave a request

    Use the form on this page, WhatsApp or the phone.

  2. 2

    We visit to assess

    At an agreed time we look at the site and discuss your requirements.

  3. 3

    You get a proposal

    Price, scope of work and schedule, in writing.

  4. 4

    We clean

    One-off or on contract, at hours that suit you.

Cleaning before handover

Before units are handed over to buyers or tenants, the building needs to look ready to live and work in. We remove construction dust and finishing residue and clean windows, fixtures and common areas.

How we price

The guide is a price per square metre. The total depends on the condition of the site, the number of floors and windows, and the timeline, so we visit first and send a written proposal.

Timing and schedule

The work can be split by phase, entrance or floor to match your handover plan. The schedule is fixed in the contract.

Frequently asked questions

How much does building cleaning before handover cost?

We calculate the price individually after an on-site assessment: it depends on the area, stage of readiness and scope of work.

What does new-build cleaning include?

Apartments and commercial units, entrances, stairwells, lift lobbies, windows and shop fronts after construction.

Do you work with VAT?

Yes, we work under contract and can issue VAT invoices.

Can the building be cleaned in phases, by entrance or floor?

Yes, the order and schedule are agreed during the assessment to match your handover plan.

Do you clean individual apartments after renovation?

Yes, private clients can book post-renovation cleaning. The price and minimum order are on the service page.

All questions

Read next

Prices 3 min read

Office Cleaning: One-Off or on Contract?

One-off office cleaning or a regular cleaning contract: how they differ, what the price depends on and how to choose the right frequency in Yerevan.

All blog articles

Preparing a building for handover?

Call or message us on WhatsApp to arrange a site visit.

Call WhatsApp